U-2 Photo
|
|
|
First Delivery of New U-2 Cockpit The April 2002 delivery of the first U-2S equipped with the new Reconnaissance Avionics Maintainability Program (RAMP) cockpit upgrade. RAMP will upgrade the 1960s-vintage cockpit with newly installed equipment, including three 6-by-8-inch multifunction displays, an up-front control and display unit, and an independent secondary flight display system. The new equipment replaces older systems that are no longer supportable and provides improved pilot situational awareness. The entire fleet of 31 U-2S models and four two-cockpit trainers will be modified before the project is completed in 2007.
Original Images Image #1 — High Resolution, TIF, Lockheed Image #2 — Medium Resolution, JPG, USAF Image #3 — Low Resolution, JPG, Lockheed Information Pages
Images On This Page Thumbnail: 195 x 150 pixels – 10,333 bytes (CRO-75) |
|
|
|
|
Cutout from Hi-Res Image #2 See this page for info about Hi-Res Cutouts. |
|
Back to the main U-2 graphics page
NOTICE - This site is currently undergoing extensive restructuring. Failing links are being identified and removed and the HTML is being corrected and revised to better use CSS Structures. I appreciate your patience while this effort is underway. Please feel free to email me about any errors you detect. Completion is currently estimated for December 2011.
Check out my free ezine Snippets and blog My
Ephemerae.
Yes ... I want you to link to my site. Please link to me.
Want to email me? I'd love to hear from you.
|
|
|